This page is generally updated daily after 14:30 |
 |
File Image of Pebble Bay at 88% |
| 22-Feb-2013 | Current | Daily Change (Avg.) | Weekly Change |
| Volume (Glitre) | 84.5 | 87.8 % | 0 | 0 % | 0 | 0 % |
| Level Below FSL (m) | 3.1 | 0 | 0 |
| Level (Aus Height Datum, m) | 175 | 0 | 0 |
| Pebble Beach Advance (m) | | 0 | 0 |
| Depth at Common Mark (m) | 30 |
| Launching | Easy |
|
| Sources |
| Maroondah Volume (Glitre) | 19 | 85.7% |
| Eildon Volume (Glitre) | 3084 | 92.5% |
| Yarra Glen Flow (Gl/day) | 0.3 |
| Warrandyte Flow (Gl/day) | 0.5 |
| Difference (Gl/day) | -0.2 |
| Goulburn Pipeline Since Yesterday (Glitre) | 0 |
| Distribution Network | Map |
|
 |
 |
| |
| Chart |
Sugarloaf Storage History from Year 2000 |
 |
 |
File Image, Pebble Bay at Lowest Level, 12%, April 2009 |