This page is generally updated daily after 14:30 |
 |
File Image of Pebble Bay at 99% |
| 5-Feb-2012 | Current | Daily Change (Avg.) | Weekly Change |
| Volume (Glitre) | 95.31 | 99 % | 0 | 0 % | 0 | 0 % |
| Level Below FSL (m) | 0.2 | 0 | 0 |
| Level (Aus Height Datum, m) | 178 | 0 | 0 |
| Pebble Beach Advance (m) | | 0 | 0 |
| Depth at Common Mark (m) | 33 |
| Launching | Easy |
|
| Sources |
| Maroondah Volume (Glitre) | 22 | 99.2% |
| Eildon Volume (Glitre) | 3218 | 96.5% |
| Yarra Glen Flow (Gl/day) | 0.5 |
| Warrandyte Flow (Gl/day) | 0.4 |
| Difference (Gl/day) | 0.1 |
| Goulburn Pipeline Since Yesterday (Glitre) | 0 |
| Distribution Network | Map |
|
 |
 |
| |
| Chart |
Sugarloaf Storage History from Year 2000 |
 |
 |
File Image, Pebble Bay at Lowest Level, 12%, April 2009 |